Thanks anc, Basement not done. Ssoo much kids homeowrk and sport and clubs and music. Three hour increments is what i need to be productive and i just cant string that together.
Ive done everything from demo to cutting the floor, framing, insulating, electrical, plumbing, drywall, cabinets& painting. I am working on ceramic tile about 650 sqft left.
We have designed an awesome space...tv/family room, gaming table area, wet bar, fitness room, bathroom, laundry and storage rooms. I have to do all the final wiring after.floors, doors and trim are in. Then ceilings. Then bathroom fixtures...all roughs are done. Getting close, but oh so far.
Maybe i need to just immerse myself again for 6 months, really break away for a while, idk.