Hi Trip!

What is left to be done??? Well, its always a work in progress. The kitchen wallpaper is a big deal. The only papering I've ever done was here in the bathroom 10 years. That was a nightmare. This is a much bigger room but it will still be a lot of work. But since it cost me neary $500 - Im gonna gitter dun.

The floor in the kitchen shifted a bit in last winter's snow and from the retaining wall leaning on it. (no one seems to notice this but me) but it will need to be levelled out and then I'm going to get wood laminate flooring done instead of the crappy vinyl on it now. I am actually considering extending it into the living room which is adjacent and going with a forest animals area rug. We'll see. Josh has suggested waiting till next Spring on the floor levelling as it might shift back. SO far it has been doing that since the pressure of the retaining wall has lifted. Besides - can't afford the floor till then.

I also have a large, unfinished upstairs which will be next on the list. I have to upgrade my electrical to handle that reno first. And I also need some landscaping done to improve outdoor stairs/paths.

As you see - it is a never ending battle. But this year tops them all for BIG IMPROVEMENTS!

Barb